Knowledge Hub

Commissioning and Handover Guide for Solar PV

This guidance was developed as part of direct support provided by the Zero Carbon Accelerator to an NHS Trust, and it is intended to help other organisations delivering solar PV installations.

It sets out practical advice for commissioning and handing over solar PV systems on buildings, with the aim of supporting safe, compliant, and consistent delivery. It explains the minimum expected standards, the key commissioning tasks, and the documents that should be provided at handover. The guidance is designed to be flexible so it can be used for different project sizes, sites, and governance arrangements.

This document should be used alongside current legislation, relevant British Standards, MCS requirements, and any sector‑specific or organisational policies and procedures. It should be adapted as needed to suit the specific project and site.

Read the guide (PDF, 419KB)

Found this useful? If you have suggestions or feedback on this resource we’d love to know – send us feedback.