Brandon Estate – Ground Source Heat Pump Feasibility Study
This report presents the findings of the Brandon Estate Ground Source Heat Pump (GSHP) Feasibility study, prepared for the London Borough of Southwark. Heat usage at the site is metered at the substations that supply each housing block. A heat loss assessment was completed to identify the heat demand at the dwellings and the secondary side building losses.
The work has been conducted by Sustainable Energy Limited (SEL), and this report will be peer-reviewed by Buro Happold as part of the Local Energy Accelerator (LEA) Programme Delivery Unit support for the project.
Read the feasibility study (PDF, 2.86MB)
Found this useful? If you have suggestions or feedback on this resource we’d love to know – send us feedback.