Case study: decarbonising Edmonton Methodist Church

Top of Aldgate Church with Cherry blossoms and a blue sky

At a glance

  • The Mayor of London’s Zero Carbon Accelerator helped Edmonton Methodist Church assess options for decarbonising its building as part of a wider refurbishment and restoration project.
  • The project explored a range of heating, energy efficiency and renewable energy options, while also producing a good practice guide to support churches and heritage buildings, including those across the London Methodist network.
  • The church is progressing with a refurbishment that will restore reliable heating and improve the building, while keeping future options open for a transition to low-carbon heating.

The Mayor of London’s Zero Carbon Accelerator supported Edmonton Methodist Church in Enfield in refurbishing and decarbonising its building.

The work aligned with the Methodist Church’s ambition to become a net zero carbon organisation by 2030 and supported the church’s wider restoration programme.

The church had been without a permanent heating system for more than a decade and had relied on temporary liquefied petroleum gas (LPG) heating. This created an urgent need for a reliable and affordable replacement while providing an opportunity to consider longer-term decarbonisation options.

The Mayor of London’s Zero Carbon Accelerator provided specialist technical advice that would have been difficult for the church to access within its own budget.

The support helped the church assess heating and energy options and make informed decisions about its refurbishment plans.

The project adopted a whole-building approach, considering:

  • building fabric performance
  • heating controls
  • occupancy patterns
  • electrical capacity
  • heritage constraints
  • funding opportunities
  • implementation and procurement requirements.

The appraisal compared the cost, carbon and practical implications of air source heat pumps, district heating, gas boilers, solar photovoltaic (PV), lighting upgrades and other measures.

The study also identified gaps in the available energy data due to the absence of a permanent heating system. The study therefore used best-practice assumptions and recommended further modelling once the refurbished building has been in use and more representative data becomes available.

A good practice guide was developed to help churches and heritage buildings, including those across the London Methodist network, assess decarbonisation options and funding opportunities.

The project has not secured any implementation funding yet, but the appraisal identified the following potential funding sources:

  • heritage and charitable grants
  • Methodist-specific funding opportunities
  • community energy funding
  • repayable finance.

The work also highlighted the potential benefits of developing projects across groups of churches to strengthen future funding and procurement opportunities.

Like many community and heritage buildings, the church faced challenges around affordability, data availability and balancing immediate operational needs with longer-term net zero ambitions.

Funding constraints
Limited funding meant low-carbon heating could not be delivered within the current refurbishment budget.

The church adopted a phased approach that prioritises restoring reliable heating and improving the building now, while keeping future decarbonisation options open.

Limited building performance data
Because the building had relied on temporary LPG heating for more than a decade, available energy data did not provide a reliable basis for modelling future heat demand.

The project team addressed this through a structured options appraisal and recommended revisiting the analysis once more representative operational data becomes available.

A key lesson from the project is that decarbonisation plans must reflect operational and financial realities. For Edmonton Methodist Church, restoring reliable heating needed to happen alongside planning for future carbon reduction.

The project also reinforced the value of following the energy hierarchy, starting with building performance and lower-cost measures before progressing to larger investments.

Finally, coordinating upgrades to lighting, electrical infrastructure and other building systems can help avoid additional costs and support future decarbonisation measures.

The project remains at feasibility stage, so carbon savings are indicative.

The assessment showed that prior to the heating failure, gas use represented the largest source of operational emissions and therefore presents the greatest opportunity for carbon reduction.

The modelling estimated baseline emissions of approximately 24.3 tCO2e per year in 2025.

A future low-carbon scenario combining energy efficiency improvements, heat decarbonisation and grid decarbonisation could deliver an estimated 17.5 tCO2e annual reduction.

Final energy and carbon savings will depend on the measures that are implemented and will need confirmation through detailed design and updated operating data.

The first phase of refurbishment is now progressing and includes:

  • new gas boilers to restore reliable heating
  • electrical upgrades
  • replacement lighting using LED technology.

The church intends to review its heating strategy after one to two years of operation, when more representative energy data is available. This will provide a stronger evidence base for assessing future low-carbon heating options.

Learning from the project may also help inform future decarbonisation programmes for churches, faith and heritage buildings across London.

The project demonstrates how churches and community buildings can begin their decarbonisation journey even when funding, data and technical resources are limited.

The accompanying good practice guide provides practical advice for churches, including those across the London Methodist network, supporting a more consistent approach to assessing buildings, identifying interventions and planning delivery.

The project also highlights opportunities for collaboration across faith organisations through shared learning, procurement and funding approaches.